Last week (week of May 1), we accomplished the following work:
- Completed EB milling
- Began installing a rip-rap swale from Alpine Dr. to the Rochambeau Bridge
- Continued to form and pour sidewalks Newtown & Southbury
- Continued spot-repair on existing substructure concrete
- Continued to install rip-rap for slope protection
- Continued to rub and grind parapet concrete
- Continued to monitor and control environmental BMPs
During the week of May 8, we will pave the Eastbound bridge and continue to:
- Install rip-rap swale from Alpine Dr. to the Rochambeau Bridge
- Form and pour sidewalks Newtown & Southbury
- Perform spot-repair on existing substructure concrete
- Install rip-rap for slope protection
- Rub and grind parapet concrete
- Monitor and control environmental BMPs