Saturday 7/30/22

  • The Navigation Channel will be open.
  • Contractor will be onsite continuing steel processing for load out.
  • Contractor will be continuing Pier 2 concrete demolition.
  • Contractor will prepare for the pier cap concrete pour for Pier 1.

Completed Work (Week of 7/24/2022)

  • Continued steel demolition of the eastbound bridge; all steel has been successfully removed
  • Completed concrete pour for Abutment 1 stem and pedestals
  • Continued water transportation and rescue operations in support of demolition crews
  • Completed pier cap reinforcement cage

Upcoming Work (Week of 8/1/2022)

  • Continue steel processing and load out
  • Assemble and install effective concrete formwork platforms at Pier 2
  • Continue reinforcing steel installation
  • Continue pre-assembly of pier reinforcing steel cages

Photos below:

  1. Eastbound bridge steel demo progress
  2. Lifting of Pier 1 pier cap formwork
  3. Last existing bridge steel member being lifted to staging area for downsizing